News and views for the UB community
Three workers are needed to control and properly position the concrete pump hose.
Concrete is pumped into the prepared area.
Other workers spread the concrete as it’s pumped into the space.
A small area is smoothed out.
Then the concrete measured to ensure it’s evenly distributed.
Workers use a flat edge to screed the surface and smooth it out.
A bull float is used to further compact the concrete and finish the surface.
Work on One World Café continues and last week the concrete floor was poured. Take a peek behind the tarp and see the process in action. Photos: Douglas Levere
Published December 8, 2020